- Peer reviews ( Offset well review, Risk management and lessons learned)
- Well design (Well planning, Casing Design, casing wear analysis)
- Material Selection
- Completion Design (ESP and gas lift, artificial lift design, tubing design and wellbore thermal modeling)
- Multi-lateral and ERD well design
- Acid/Hydro. Fracking design
- Well Test Design
- Operations Programming and Execution
- Cost estimation and AFE preparation
- Post Well Reviews and Recommendations
- Well Management Systems and Well Examination
- Problem and post operations reviews
- NPT Mitigation
- Tender documents preparation
- Training
- Software Installation and development
- MDP & FEED Preparations
- Well Control Procedures
- Well Integrity Plan and Procedures
- Drilling Technical Manual
- Data Base Management System
- Develop standards, best practices, and performance metrics (KPIs)
- Safety and Health Plans, Emergency Response Plans (ERP), Well Control Emergency Response Plan (WCERP), Safety Manuals
- Post-well Review ( Lessons learned, after action reviews)